Concrete Contractor in Battle Ground, IN
Sidewalks, driveways, patios and pole barn slabs in Battle Ground, built to the town's sidewalk code. Contact us for a free, no-pressure estimate.
Get Your Free Battle Ground Estimate
*Indicates Required Field

Why Choose Us
Concrete Work in Battle Ground, IN
Battle Ground's town code spells out how sidewalks get built: width, base, thickness, finish and mix. Driveways that cross the walk have their own depth rule. We build to those standards and check permits with Town Hall before we schedule.
- Your satisfaction 100% guaranteed
- Hundreds of happy customers
- Serving the greater Lafayette area for years
- Free, no-pressure estimates

Our Battle Ground Work
Concrete for Battle Ground Homes

Sidewalks to Code
Five-foot walks with a compacted base, a 4-inch slab and a broom finish, as the town code requires.

Driveways
New and replacement driveways, with the section across the sidewalk poured 6 inches deep.

Pole Barn Slabs
Slabs for pole barns and shops on rural lots, scheduled around the county's post-hole inspection.
How It Works
Three Simple Steps
Here is what to expect when you reach out about your project.
- Tell us about your project: fill out the form or call (765) 544-3470
- Get your free, no-pressure estimate
- Town and county checks, then your pour date

Battle Ground’s sidewalk standards
Battle Ground had 1,838 residents and 706 housing units in the 2020 Census, and its town code spells out how a sidewalk has to be built. The standards, passed in August 2022, require:
- A width of at least 5 feet, with walks running from property line to property line
- A compacted sub-base of 3 to 4 inches, at minimum
- A 4-inch slab
- A broomed or textured finish rather than a smooth one, with troweled edges and joints
- At least a five-bag mix that contains fiberglass or wire
Asphalt and slick-surfaced sidewalks are prohibited. A driveway crossing the sidewalk space has to match the sidewalk grade and be 6 inches deep in the same material, and alley crossings are 6 inches of concrete. Ramps at corners are the town’s job.
The same chapter covers repairs. When the town notifies an owner that a sidewalk needs work, the owner has 30 days to repair it or file a repair plan; after that the town can make the repair and file a lien. Before damaging or removing a sidewalk, the owner must notify the council and have the walk evaluated. Town cost-sharing on repairs happens only once.
Concrete jobs in Battle Ground
Sidewalks
The code names sidewalks linking the schools with Battlefield Park and North Street / Railroad Street as a priority corridor, and 2025 council agendas listed a High School Street sidewalk project and enforcement of the sidewalk ordinance. A sidewalk we pour in town follows the base, thickness, finish and mix rules above.
Driveways
On a new or replacement driveway, the section across the sidewalk gets the 6-inch depth and the sidewalk’s grade. Past the walk, ConcreteNetwork treats 4 inches as enough for passenger cars and SUVs, and we go thicker where trucks or trailers will park.
Patios
The town’s stormwater utility counts patios, driveways and sidewalks as impervious surface, and its 2017 FAQ said engineers put the cost of fixing all identified stormwater issues at over three million dollars. A patio here gets enough slope to move water off the slab and away from the house, plus a place for that water to go.
Pole barn and shop slabs
On rural lots in unincorporated Tippecanoe County, permits go through the county Building Commission, whose FAQ says pole barn post holes are 48 inches deep and must be inspected before poles are set. The Census counted 363 single-family homes permitted in the unincorporated county in 2023, 413 in 2024 and 470 in 2025. We schedule the pole barn slab around the post-hole inspection.
Removing an old walk
Because the code requires notice to the council before a sidewalk is damaged or removed, we wait for that step before any concrete removal on a public walk. Old private slabs, patios and drives get broken out and hauled away before the new base goes in.
Who to call before a Battle Ground project
Start with Town Hall at 100 College Street, (765) 567-2603. The town’s forms page lists only a stormwater fee appeal and a public access form, and it tells residents to contact or visit Town Hall if the permit they need isn’t there.
The Tippecanoe County Building Commission (765-423-9225) says it covers most of the county outside Lafayette and West Lafayette, but its page doesn’t name individual towns. Battle Ground is a member of the Area Plan Commission of Tippecanoe County, which handles zoning and variances at 765-423-9242. Ask Town Hall and the Building Commission which office handles your project, and whether it needs a permit, before anything gets formed.
A drive that connects to a county road needs a Tippecanoe County Highway Department permit, and the residential fee is $25. The county’s driveway rules call for a culvert at least 12 inches across, in galvanized corrugated steel or reinforced concrete pipe, with the size set by the county inspector and no plastic pipe. Concrete headwalls aren’t permitted, the drive must be at least 12 feet wide where it crosses the side ditch, and the entrance must stay at least 5 feet from the side property line. The Highway Department is at 765-423-9210.
Battle Ground drainage and flood points
Sorting the USDA soil survey by area for a square about 5 kilometers on a side, centered on Battle Ground, turns up a lot of well-drained ground. About 45 percent is well drained and another 11 percent drains excessively or somewhat excessively. Billett soils, formed in water- or wind-deposited loamy or sandy sediment, cover about 15 percent. On 60 percent of the square, the survey shows no water table within about 6.5 feet.
It isn’t all dry ground. Crosby-Miami silt loam is the largest unit at about 16 percent, and Crosby’s perched water table rises to between half a foot and 2 feet below the surface during winter and spring. About 14 percent of the square floods occasionally or frequently, and frost action is rated moderate on 49 percent and high on 31 percent. Base depth and slope get decided lot by lot.
FEMA lists Battle Ground as a separate, participating NFIP community whose current flood map dates from September 25, 2009. When the Wabash River at Lafayette reaches 17 feet, the National Weather Service says floodwaters close SR 225 just south of the river near Battle Ground. The Wabash gauge near Battle Ground set its record, 26.14 feet, on April 20, 2013.
Indiana’s model floodplain rules put a new home’s lowest floor at or above the flood protection grade, which is 2 feet over the base flood elevation. If a garage or shop slab is planned near a mapped flood zone, check the map with the offices above first.
Battle Ground weather and pour timing
The nearest NOAA normals station, W Lafayette 6 NW, shows 39.7 inches of precipitation, a provisional 18.9 inches of snow, 128.7 nights at 32°F or colder and 16.9 days at 90°F or above in a typical year (1991 to 2020). Its median last spring freeze is April 26, and its median first fall freeze is October 12.
Tippecanoe County’s footing depth in the 2020 Indiana Residential Code table is 30 inches, measured from finish grade to the bottom of the footing, and footings can’t bear on frozen soil. ConcreteNetwork is just as firm about flatwork: no concrete goes onto frozen ground, ice or snow. In cold weather, NRMCA recommends concrete at least 55°F as placed for sections under 12 inches thick, under insulated blankets or tarps, and it recommends about 6 percent air for exterior slabs.
Battle Ground concrete prices from cost guides
There’s no Battle Ground cost data in the guides. HomeBlue’s Lafayette, Indiana pages are the nearest match, and these Lafayette area figures cover common residential jobs:
| Job | Lafayette area range |
|---|---|
| Reinforced patio, 10 x 20 ft | $1,300 to $2,200 |
| Reinforced one-car driveway, 12 x 30 ft | $2,300 to $4,000 |
| Reinforced slab, per square foot | $7 to $11 |
| Reinforced slab, 30 x 30 ft (4 to 6 in.) | $8,200 to $14,100 |
The patio row comes from HomeBlue’s Lafayette, IN patio page, published April 26, 2022; the driveway row from its driveway page of June 10, 2024; and the slab rows from its slab page of September 27, 2024. These are cost-guide numbers, not quotes from us.
What you’ll pay depends on the job. Thickness, reinforcement, tearing out old concrete, access for the truck, a 6-inch section across the town sidewalk and a culvert on a county road all change it. Your estimate costs nothing.
We work in Battle Ground, on the county roads around it, and in Lafayette.
Battle Ground Concrete FAQs
How thick does a sidewalk in Battle Ground have to be?
The town code calls for a 4-inch slab on at least 3 to 4 inches of compacted sub-base, with a broomed or textured finish.
Can I replace my sidewalk with asphalt?
No. The code prohibits asphalt and slick-surfaced sidewalks.
The town says my sidewalk needs repair. How long do I have?
Thirty days to make the repair or file a repair plan. After that the town can do the work and file a lien.
Will the town split the cost?
The code says town cost-sharing happens only once. Call Town Hall at (765) 567-2603 to ask how that applies to your frontage.
What does a county driveway permit cost?
The Tippecanoe County Highway Department’s residential drive permit is $25. It covers drives onto county roads, and the county inspector sets the culvert size.
How does the town bill stormwater for homes?
Under the 2017 stormwater policy, each residential property counts as one equivalent residential unit, defined as 3,200 square feet of impervious area. Ask Town Hall for the current rate.
More towns near Battle Ground
We also work in West Lafayette, Brookston and Delphi. The Lafayette concrete contractor page covers the city itself.
Your Local Concrete Experts
Get A Free Estimate
Give us a call now or fill out the form above to get your 100% free, no-pressure estimate on your Battle Ground concrete project.
